Over time we will be inviting people to sponsor different parts of the ship so that they can make a direct contribution. As you would imagine there is a long list of parts which vary in size and visibility, however every part is equally as important, as without it the ship cannot take shape.
The first ‘Sponsor a Part’ launch involves the fixings. These will be a variety of rivets and treenails made from metal and wood. All in all the ship needs 4308 different fixings which have all be deduced from the archaeological excavations that took place. This number is made up of the following:
3598 Plank Rivets
162 Scarf Rivets
64 Iron Spikes
402 Wooden Treenails
24 Keel Scarf Bolts
To sponsor one, or a collection, of these fixings please select what you would like to add to the build by putting it into your shopping basket and continuing to the checkout.
In return we will add your fixing number and name to the roll of honour on the website and send you a limited edition ‘Ships Co. Sponsorship’ Pin Badge.